Skip to main content
RIR (reps in reserve)

RIR (reps in reserve)

RIR is how many repetitions someone could still have completed at the end of a set before reaching technical failure. RIR 2 means two reps were left in the tank. It is an effort scale reported set by set, and it lets a coach prescribe intensity without depending on a fixed percentage of 1RM.

RIR (reps in reserve)

RIR is how many repetitions someone could still have completed at the end of a set before reaching technical failure. RIR 2 means two reps were left in the tank. It is an effort scale reported set by set, and it lets a coach prescribe intensity without depending on a fixed percentage of 1RM.

Also written as: RIR · reps in reserve

In practice

It is the cheapest datum to collect and the most informative one available for adjusting the following week: it needs no equipment, the client reports it in two seconds, and it captures the bad day a fixed percentage ignores.

The common mistake

Beginners systematically underestimate their RIR — they report 2 when 5 were left. Calibration improves with training age, so an RIR from someone a month into lifting reads differently than one from someone three years in.

Program with these criteria, without the spreadsheet.